Draft Agenda -- SAS PHY Working Group
January 10, 2012 -- San Jose, CA
Tuesday  9:00 am -- 6:00 pm

1.   Opening Remarks
2.   Attendance
3.   Review of documents and proposals
4.   SAS-3
4.1    SAS-3 Compliance Testing (10-362r7) [Witt & Bari]
4.2    SAS Channels (11-190r3) [Witt]
4.3    SAS PHY: End-to-End Compliance Methodology and Specification (11-416r4) [Gagnon]
4.4    SAS PHY: SAS-3 Transmitter Equalization Compliance Specification (11-417r4) [Gagnon]
4.5    Channel compliance points and lengths (11-239r0) [Felton]
4.6    SAS-3 Active Cable and Tx Training (11-352r0) [Newman]
4.7    SAS-3 active Cables (11-366r1) [Oganessyan]
4.8    SAS-3 Active Cable Electrical Specifications (11-455r2) [Oganessyan]
4.9    miniSAS HD Connector Measurement Methodology and Metrics (11-453r0) [Fromm]
4.10   SFF-8631 Next Gen Device Connector (11-490r0) [Shuey]
5.   New business
5.1    SAS-3 Bad Cable (12-005r0) [Newman]
5.2    SAS-3 Bad Cable s4p (12-014r0) [Newman]
5.3    SAS Active Cable Electrical Characteristics with track changes (12-015r3) [Oganessyan]
5.4    SAS-3 Cable Assembly Fitted Insertion Loss (12-022r0) [Rost]
5.5    SAS-3 End-to-end compliance summary (12-027r0) [Gagnon]
5.6    FCI 12G SAS (12-041r0) [Zambell]
5.7    SAS-3 Transmitter Equalization Range Evaluation (11-423r2) [Gagnon]
5.8    SAS-3 Equalization Preset Limits Analysis (12-017r0) [Gagnon]
5.9    SAS-3: SBB Canister model (12-055r0) [Knight, Ely]
5.10   SAS-3 Index to 11-416r4 and 11-417r4 (12-065r0) [Gagnon]
5.11   Proposal for SAS-3 drive requirements (12-066r0) [Cox]
6.   SFF-related [Olawsky]
7.   Review of Recommendations
8.   Meeting Schedule